|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/20/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2979
|
JOB ADDRESS: 3427 MAYFLOWER DR FRISCO, TX 75034 |
DESC:
2548 AC, 2992 SQ FT, SFR / 2 STORY |
|
OWNER:
LENNAR HOMES
1707 MARKET PLACE BLVD. IRVING TX 75062
|
CONTRACTOR:
LENNAR HOMES
1707 MARKET PLACE BLVD. IRVING TX 75062
|
ISSUED DATE: 9/24/2004
APPLIED DATE:8/16/2004
EXPIRED DATE:3/16/2005
SITE APN:D254998
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
1707 MARKET PLACE BLVD. IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 190106.28
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 10/14/2004 | $30.00 |
BUILDING PERMIT FEE | $1,448.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
RESIDENTIAL ELECTRIC FEE | $89.76 |
1 INCH METER | $365.00 |
FLATWORK 2/2/2005 | $30.00 |
CO/BUILDING FIN 2/10/2005 | $30.00 |
PLUMBING FINAL 1/20/2005 TRC | $30.00 |
Total Fees: | $2,377.51 |
|
|
| ______ WATER METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ SLAB |
______ CAMERA |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|