APPROVED DATE: 8/28/2004 PERMIT SUB-TYPE: SNEW PERMIT NO: B04-2964
JOB ADDRESS:
11441 APPLE VALLEY DR
FRISCO, TX 75034
DESC:   4138 AC, 5070 SQ FT, SFR / 2 STORY
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230

CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
ISSUED DATE:
9/8/2004
APPLIED DATE:
8/21/2004
EXPIRED DATE:
3/7/2005
SITE APN:
D250006
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
308736.18
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING TOP OU 2/9/2005$30.00
RESIDENTIAL ELECTRIC FEE$152.10
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$2,038.75
FENCE FEE$20.00
UTILITY / ROW 3/31/2005 GAS$30.00
PLUMBING ROUGH-IN 1995/12/32$30.00
PLUMBING ROUGH-IN 1995/12/32$30.00
1 INCH METER$365.00
2NDS/FRAMING 2/11/2005$30.00
PLUMBING ROUGH-IN 12/28/2004$30.00
PLUMBING ROUGH-IN 12/29/2004$30.00
PLUMBING ROUGH-IN 12/30/2004$30.00
FLATWORK 1/14/2005 PDC$30.00
FLATWORK 1/17/2005 PDC$30.00
T-POLE 12/13/2004 GLC$30.00
ELECTRICAL FINAL 3/14/2005 W$30.00
DRY WALL 2/21/2005$30.00
CO/BUILDING FINAL 4/15/2005$30.00
Total Fees:$3,384.85
______  T-POLE
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  WATER METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  UTILITY / ROW
______  BRICK/WALL TIES
______  LATH
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  METER PAYMENT
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)