BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/31/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2957
|
JOB ADDRESS: 1195 DODGETON DR FRISCO, TX 75034 |
DESC:
3232 AC, 4028 SQ FT, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 9/3/2004
APPLIED DATE:8/20/2004
EXPIRED DATE:3/2/2005
SITE APN:D250035
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 241139.52
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $120.84 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,703.75 |
FENCE FEE | $20.00 |
FLATWORK 11/15/2004 GLC | $30.00 |
SLAB 11/16/2004 GLC | $30.00 |
FLATWORK 11/16/2004 GLC | $30.00 |
FLATWORK 11/29/2004 GLC | $30.00 |
SLAB 11/29/2004 GLC | $30.00 |
T-POLE 11/5/2004 GU | $30.00 |
WATER METER 10/25/2004 JR | $30.00 |
PLUMBING TOP OUT 1995/12/32 | $30.00 |
1 INCH METER | $365.00 |
2NDS/FRAMING 1/10/2005 PDC | $30.00 |
PLUMBING FINAL 3/8/2005 | $30.00 |
PLUMBING FINAL 3/9/2005 TRC | $30.00 |
ELECTRICAL FINAL 3/4/2005 VI | $30.00 |
ELECTRICAL FINA 3/7/2005 | $30.00 |
INSULATION 1/14/2005 WKT | $30.00 |
Total Fees: | $3,011.59 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ WATER METER |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ METER PAYMENT |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|