Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/31/2004 PERMIT SUB-TYPE: SNEW PERMIT NO: B04-2956
JOB ADDRESS:
1382 AUBREY LN
FRISCO, TX 75034
DESC:   3730 AC, 4570 SQ FT, SFR / 2 STORY
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230

CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
ISSUED DATE:
9/3/2004
APPLIED DATE:
8/20/2004
EXPIRED DATE:
3/2/2005
SITE APN:
D250020
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
278295.3
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL ELECTRIC FEE$137.10
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$1,888.75
FENCE FEE$20.00
2NDS/FRAMING 10/22/2004 GDS$30.00
2NDS/FRAMING 10/26/2004 GDS$30.00
2NDS/FRAMING 10/27/2004 GDS$30.00
PLUMBING TOP OUT 10/26/2004$30.00
BRICK 12/14/2004 GLC$30.00
ELECTRICAL FINAL 1/4/2005 GL$30.00
ELECTRICAL FINAL 1/5/2005 GL$30.00
CO/BUILDING FIN 1/24/2005$30.00
PLUMBING TOP OUT 10/22/2004$30.00
PLUMBING FINAL 1995/12/32 KS$30.00
1 INCH METER$365.00
PLUMBING FINAL 12/29/2004 PD$30.00
Total Fees:$3,129.85
______  WATER METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK
______  BRICK
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)