|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/24/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2868
|
JOB ADDRESS: 3513 WASHINGTON DR FRISCO, TX 75034 |
DESC:
3344 AC, 3835 SQ FT, SFR / 2 STORY |
|
OWNER:
ASHTON DALLAS RESIDENTIAL
13800 MONTFORT DR. #100 DALLAS TX 75240-1396
|
CONTRACTOR:
ASHTON DALLAS RESIDENTIAL
13800 MONTFORT DR. #100 DALLAS TX 75240-1396
|
ISSUED DATE: 8/30/2004
APPLIED DATE:8/13/2004
EXPIRED DATE:2/27/2005
SITE APN:D237241
STATUS:COMPLETED
|
|
APPLICANT:
ASHTON DALLAS RESIDENTIAL
13800 MONTFORT DR. #100 DALLAS TX 75240-1396
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 249495.84
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING TOP OUT 12/8/2004 C | $30.00 |
T-POLE 11/24/2004 CW | $30.00 |
2NDS/FRAMING 12/13/2004 CW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $115.05 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $1,743.75 |
FENCE FEE | $20.00 |
CO/BUILDING FINAL 5/9/2005 J | $30.00 |
1 INCH METER | $365.00 |
WATER METER 8/31/2004 MB | $30.00 |
CO/BUILDING FINAL RM | $30.00 |
SLAB 9/23/2004 TP | $30.00 |
PLUMBING FINAL 2/22/2005 | $30.00 |
PLUMBING FINAL 2/22/2005 | $30.00 |
PLUMBING FINAL 2/28/2005 | $30.00 |
PLUMBING FINAL 2/9/2005 TRC | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
UTILITY / ROW 3/18/2005 GAS | $30.00 |
Total Fees: | $3,006.80 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ WATER METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|