|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/21/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2817
|
JOB ADDRESS: 2148 QUAIL MEADOW LN FRISCO, TX 75034 |
DESC:
2454 AC, 2924 SQ FT, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
ISSUED DATE: 8/25/2004
APPLIED DATE:8/10/2004
EXPIRED DATE:2/24/2005
SITE APN:D238638
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 183092.94
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACEMENT CARD FEE | $10.00 |
SLAB 9/8/2004 CK | $30.00 |
FLATWORK 9/9/2004 CK | $30.00 |
PLUMBING FINAL 12/14/2004 CK | $30.00 |
PLUMBING FINAL 12/20/2004 CK | $30.00 |
PLUMBING FINAL 1/5/2005 CK | $30.00 |
2NDS/FRAMING 11/11/2004 CW | $30.00 |
2NDS/FRAMING 11/8/2004 CW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $87.72 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,413.75 |
FENCE FEE | $20.00 |
PLUMBING TOP OUT 10/26/2004 | $30.00 |
PLUMBING TOP OUT 10/29/2004 | $30.00 |
1 INCH METER | $365.00 |
WATER REGISTER PROBLEM | $90.00 |
CO/BUILDING FIN 3/1/2005 | $30.00 |
FLATWORK 10/21/2004 TP | $30.00 |
PLUMBING ROUGH-IN 8/30/2004 | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
CO/BUILDING FINAL 2/18/2005 | $30.00 |
Total Fees: | $2,744.97 |
|
|
| ______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ WATER REGISTER |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ FINAL INSPECTION |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|