|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/9/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2655
|
JOB ADDRESS: 2320 JAGUAR DR FRISCO, TX 75034 |
DESC:
2787 AC, 3239 SQ FT, SFR \ 2 STORY |
|
OWNER:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
CONTRACTOR:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
ISSUED DATE: 8/13/2004
APPLIED DATE:7/28/2004
EXPIRED DATE:2/12/2005
SITE APN:D249633
STATUS:COMPLETED
|
|
APPLICANT:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 207938.07
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 9/24/2004 GDS | $30.00 |
2NDS/FRAMING 9/27/2004 GDS | $30.00 |
2NDS/FRAMING 9/28/2004 GDS | $30.00 |
DRY WALL 10/5/2004 GDS | $30.00 |
SLAB 9/1/2004 GLC | $30.00 |
PLUMBING FINAL 10/25/2004 GU | $30.00 |
PLUMBING ROUGH-IN 8/25/2004 | $30.00 |
ELECTRICAL FINAL 10/20/2004 | $30.00 |
1 INCH METER | $365.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,533.75 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
RESIDENTIAL ELECTRIC FEE | $97.17 |
PLUMBING FINAL 10/21/2004 GU | $30.00 |
Total Fees: | $2,654.92 |
|
|
| ______ T-POLE |
______ WATER METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CAMERA |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ SLAB |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|