Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/3/2004 PERMIT SUB-TYPE: SNEW PERMIT NO: B04-2555
JOB ADDRESS:
9605 BUCKHORN DR
FRISCO, TX 75034
DESC:   3700 AC, 4504 SQ FT, SFR / 2 STORY
OWNER:
NEWCASTLE HOMES
P.O. BOX 260007
PLANO TX

CONTRACTOR:
NEWCASTLE HOMES
P.O. BOX 260007
PLANO TX
ISSUED DATE:
8/10/2004
APPLIED DATE:
7/13/2004
EXPIRED DATE:
2/9/2005
SITE APN:
D266191
STATUS:
COMPLETED
APPLICANT:
NEWCASTLE HOMES
P.O. BOX 260007
PLANO TX
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
276057
FEE SUMMARY
INSPECTION SUMMARY
LAWNSPRINKLERSYSTEM$35.00
RESIDENTIAL ELECTRIC FEE$135.12
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$1,878.75
FENCE FEE$20.00
PLUMBING TOP OUT 10/6/2004 G$30.00
1 CURBSTOP REPAIR / REPLACE$150.00
1 INCH METER$365.00
UTILITY / ROW$30.00
ELECTRICAL FINA 1/19/2005$30.00
2NDS/FRAMING 10/11/2004 TW$30.00
Total Fees:$3,092.87
______  T-POLE
______  PLUMBING ROUGH-IN
______  WATER METER
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK
______  BRICK
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)