BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/23/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2491
|
JOB ADDRESS: 12409 OLTON DR , TX 75035 |
DESC:
2762 AC, 3241 SQ FT, SFR / 2 STORY |
|
OWNER:
LEGACY HOMES
4050 W PARK BLVD PLANO TX 75093
|
CONTRACTOR:
LEGACY HOMES
4050 W PARK BLVD PLANO TX 75093
|
ISSUED DATE: 8/11/2004
APPLIED DATE:7/8/2004
EXPIRED DATE:2/10/2005
SITE APN:C2532759
STATUS:COMPLETED
|
|
APPLICANT:
LEGACY HOMES
4050 W PARK BLVD PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 206072.82
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 3/22/2005 | $30.00 |
1 INCH METER | $365.00 |
2NDS/FRAMING 12/14/2004 GDS | $30.00 |
PLUMBING TOP OUT 12/8/2004 G | $30.00 |
2NDS/FRAMING 1/11/2005 GLC | $30.00 |
2NDS/FRAMING 1/20/2005 GLC | $30.00 |
INSULATION 1/26/2005 GLC | $30.00 |
INSULATION 1/28/2005 GLC | $30.00 |
DRY WALL 1/31/2005 GLC | $30.00 |
PLUMBING TOP OUT 11/16/2004 | $30.00 |
PLUMBING TOP OUT 12/14/2004 | $30.00 |
PLUMBING TOP OUT 12/14/2004 | $30.00 |
PLUMBING TOP OUT 12/29/2004 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $97.23 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,528.75 |
FENCE FEE | $20.00 |
FLATWORK 10/14/2004 JM | $30.00 |
SLAB 10/18/2004 JM | $30.00 |
SLAB 10/19/2004 JM | $30.00 |
CO/BUILDING FINAL 1995/12/32 | $30.00 |
PLUMBING FINAL 3/17/2005 | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
2NDS/FRAMING 1/12/2005 TW | $30.00 |
Total Fees: | $2,912.98 |
|
|
| ______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ ACCESS CONTROL ACCEP |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|