|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/11/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2466
|
JOB ADDRESS: 10176 GENTRY DR , TX 75035 |
DESC:
3007 AC, 3508 SQ FT, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
ISSUED DATE: 8/12/2004
APPLIED DATE:7/7/2004
EXPIRED DATE:2/11/2005
SITE APN:C2537220
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 224352.27
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
CREDIT CARD CONVENIENCE FEE | $1.80 |
FLATWORK 10/20/2004 GLC | $30.00 |
PLUMBING FINAL 11/30/2004 GU | $30.00 |
RESIDENTIAL ELECTRIC FEE | $106.05 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
PLAN REVIEW FEE | $50.00 |
BUILDING PERMIT FEE | $1,618.75 |
FENCE FEE | $20.00 |
FLATWORK 9/29/2004 JM | $30.00 |
FLATWORK 10/1/2004 JM | $30.00 |
2NDS/FRAMING 10/1/2004 JM | $30.00 |
2NDS/FRAMING 10/7/2004 JM | $30.00 |
INSULATION 10/14/2004 JM | $30.00 |
FLATWORK 10/19/2004 JM | $30.00 |
2NDS/FRAMING 10/12/2004 PDC | $30.00 |
FLATWORK 10/21/2004 PDC | $30.00 |
1 INCH METER | $365.00 |
PLUMBING TOP OUT 9/21/2004 T | $30.00 |
PLUMBING TOP OUT 9/22/2004 T | $30.00 |
Total Fees: | $2,904.10 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ CAMERA |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ FLATWORK |
______ FLATWORK |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ INSULATION |
______ FLATWORK |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|