|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/30/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2148
|
JOB ADDRESS: 3871 BAROQUE WAY FRISCO, TX |
DESC:
2956 AC, 3456 SQ FT, SFR / 2 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 7/7/2004
APPLIED DATE:6/11/2004
EXPIRED DATE:1/6/2005
SITE APN:D255918
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 220547.16
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 1/19/2005 | $30.00 |
PLUMBING FINAL 11/5/2004 KSH | $30.00 |
T-POLE 7/8/2004 RM | $30.00 |
1 INCH METER | $365.00 |
PLUMBING TOP OUT 9/1/2004 TR | $30.00 |
INSULATION 9/8/2004 TW | $30.00 |
DRY WALL 9/27/2004 TW | $30.00 |
PLUMBING ROUGH-IN 7/15/2004 | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,598.75 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
RESIDENTIAL ELECTRIC FEE | $106.38 |
Total Fees: | $2,641.13 |
|
|
| ______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ DRY WALL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ METER PAYMENT |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|