|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/25/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-2042
|
JOB ADDRESS: 11711 CORSICANA DR FRISCO, TX 75035 |
DESC:
1832 AC, 2277 SQ FT, SFR / 1 STORY |
|
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
ISSUED DATE: 7/19/2004
APPLIED DATE:6/3/2004
EXPIRED DATE:11/7/2005
SITE APN:C2519991
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 136685.52
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD CONVENIENCE FEE | $11.80 |
1 INCH METER | $365.00 |
2NDS/FRAMING 10/26/2004 GLQ | $30.00 |
PLUMBING FINAL 1/7/2005 | $30.00 |
PLUMBING FINAL 1/5/2005 GU | $30.00 |
RESIDENTIAL ELECTRIC FEE | $68.31 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
BUILDING PERMIT FEE | $1,178.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 10/20/2004 JM | $30.00 |
2NDS/FRAMING 10/29/2004 JM | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING ROUGH-IN 8/10/2004 | $30.00 |
PLUMBING TOP OUT 10/8/2004 T | $30.00 |
PLUMBING TOP OUT 10/12/2004 | $30.00 |
Total Fees: | $2,196.86 |
|
|
| ______ PLUMBING ROUGH-IN |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING ROUGH-IN |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|