|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/10/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-1819
|
JOB ADDRESS: 3465 NATION DR FRISCO, TX 75034 |
DESC:
3825 AC, 4577 SQ FT, SFR \1 STORY |
|
OWNER:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210 IRVING TX
|
CONTRACTOR:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210 IRVING TX
|
ISSUED DATE: 6/28/2004
APPLIED DATE:5/19/2004
EXPIRED DATE:12/27/2004
SITE APN:D254967
STATUS:COMPLETED
|
|
APPLICANT:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210 IRVING TX
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 285383.25
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING TOP OUT 12/14/2004 | $30.00 |
PLUMBING TOP OUT 12/20/2004 | $30.00 |
PLUMBING TOP OUT 12/29/2004 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $137.31 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $267.00 |
BUILDING PERMIT FEE | $1,923.75 |
FENCE FEE | $20.00 |
1 INCH METER | $365.00 |
PW METER ADDENDUM / REVISION F | $15.00 |
PW METER ADDENDUM / REVISION F | $15.00 |
PLUMBING FINAL 3/3/2005 | $30.00 |
INSULATION 1/18/2005 | $30.00 |
INSULATION 1/20/2005 | $30.00 |
PLUMBING ROUGH-IN 9/15/2004 | $30.00 |
SLAB 10/21/2004 TP | $30.00 |
PLUMBING TOP OUT 12/28/2004 | $30.00 |
PLUMBING TOP OUT 12/29/2004 | $30.00 |
PLUMBING TOP OUT 12/30/2004 | $30.00 |
PLUMBING TOP OUT 1/12/2005 T | $30.00 |
CREDIT CARD CONVENIENCE FEE | $2.50 |
Total Fees: | $3,248.06 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|