APPROVED DATE: 6/7/2004 PERMIT SUB-TYPE: SNEW PERMIT NO: B04-1699
JOB ADDRESS:
4684 PARKSIDE DR
FRISCO, TX 75034
DESC:   7119 AC, 8340 SQ FT, SFR / 2 STORY
OWNER:
CHARLES R SWINDOL
4684 PARKSIDE DRIVE
FRISCO TX

CONTRACTOR:
JOHN RAMER
PO BOX 299
CELINA TX 75009
ISSUED DATE:
6/9/2004
APPLIED DATE:
5/12/2004
EXPIRED DATE:
5/31/2006
SITE APN:
D247948
STATUS:
COMPLETED
APPLICANT:
JOHN RAMER
PO BOX 299
CELINA TX 75009
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
531148.59
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL ELECTRIC FEE$250.20
MISCELLANOUS MECHANICAL FEES$202.00
MISCELLANEOUS PLUMBING FEES$314.00
BUILDING PERMIT FEE$3,385.75
FENCE FEE$20.00
PLUMBING ROUGH-IN 7/14/2004$30.00
PLUMBING ROUGH-IN 7/14/2004$30.00
PLUMBING TOP OUT 10/29/2004$30.00
1 INCH METER$365.00
2NDS/FRAMING 11/11/2004 TP$30.00
LAWNSPRINKLERSYSTEM$35.00
Total Fees:$4,691.95
______  T-POLE
______  PIER
______  WATER METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK
______  INSULATION
______  DRY WALL
______  T-HEAT
______  FLATWORK
______  FLATWORK
______  METER PAYMENT
______  UTILITY / ROW
______  MISCCO
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)