|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/24/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-0820
|
JOB ADDRESS: 13268 BUGATTI DR FRISCO, TX |
DESC:
2928 AC, 3688 SQ FT, SFR \ 2 STORY |
|
OWNER:
WHATLEY, BURL W & BETTY B
FRISCO TX 75033
|
CONTRACTOR:
|
ISSUED DATE: 4/2/2004
APPLIED DATE:3/23/2004
EXPIRED DATE:10/1/2004
SITE APN:D248565
STATUS:COMPLETED
|
|
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 217861.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
1 INCH METER | $365.00 |
CO 7/20/2004 GLC | $30.00 |
2NDS 6/3/2004 JM | $30.00 |
2NDS 6/3/2004 JM | $30.00 |
PLUMBING FINAL 1995/12/32 KS | $30.00 |
PLUMBING FINAL 7/2/2004 KSH | $30.00 |
INSULATION 6/10/2004 RM | $30.00 |
RESIDENTIAL ELECTRIC FEE | $110.64 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
BUILDING PERMIT FEE | $1,583.75 |
FENCE FEE | $20.00 |
FLATWORK 7/7/2004 TG | $30.00 |
PLUMBING FINAL 7/7/2004 TRC | $30.00 |
PLUMBING TOP OUT 5/24/2004 T | $30.00 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $2,775.39 |
|
|
| ______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ CAMERA |
______ FLATWORK |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ CO |
______ CO |
______ CAMERA |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|