BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/22/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-0794
|
JOB ADDRESS: 11702 BALCH SPRINGS CT FRISCO, TX 75035 |
DESC:
1806 AC, 2280 SQ FT, SFR \ 1 STORY |
|
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
ISSUED DATE: 3/30/2004
APPLIED DATE:3/15/2004
EXPIRED DATE:9/29/2004
SITE APN:C2520035
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 134745.66
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING TOP OUT 5/27/2004 G | $30.00 |
PLUMBING TOP OUT 5/25/2004 K | $30.00 |
1 INCH METER | $365.00 |
RESIDENTIAL ELECTRIC FEE | $68.40 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
BUILDING PERMIT FEE | $1,168.75 |
FENCE FEE | $20.00 |
INSULATION 6/9/2004 TG | $30.00 |
Total Fees: | $2,025.15 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ SLAB |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ INSULATION |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ CO |
______ UTILITY / ROW |
______ CAMERA |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|