|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/9/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-0618
|
JOB ADDRESS: 1331 CROCKETT DR FRISCO, TX 75034 |
DESC:
4290 AC, 5112 SQ FT, SFR \ 2 STORY |
|
OWNER:
DREES CUSTOM HOMES X-05/03
6051 STATE HIGHWAY #161 IRVING TX 75038
|
CONTRACTOR:
DREES CUSTOM HOMES X-05/03
6051 STATE HIGHWAY #161 IRVING TX 75038
|
ISSUED DATE: 3/30/2004
APPLIED DATE:2/27/2004
EXPIRED DATE:9/29/2004
SITE APN:D247779
STATUS:COMPLETED
|
|
APPLICANT:
DREES CUSTOM HOMES X-05/03
6051 STATE HIGHWAY #161 IRVING TX 75038
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 320076.9
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING TOP OUT 7/16/2004 T | $30.00 |
PLUMBING TOP OUT 7/21/2004 T | $30.00 |
PLUMBING TOP OUT 7/22/2004 T | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
RESIDENTIAL ELECTRIC FEE | $153.36 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,098.75 |
FENCE FEE | $20.00 |
2NDS 7/27/2004 GDS | $30.00 |
ELECTRICAL FINAL 9/28/2004 R | $30.00 |
1 INCH METER | $365.00 |
PLUMBING FINAL 9/23/2004 TP | $30.00 |
Total Fees: | $3,262.11 |
|
|
| ______ WATER METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|