Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/28/2004 PERMIT SUB-TYPE: SNEW PERMIT NO: B04-0529
JOB ADDRESS:
11125 CORSICANA DR
FRISCO, TX 75035
DESC:   4608 AC, 5637 SQ FT, SFR \ 2 STORY
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501
FRISCO TX 75034

CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501
FRISCO TX 75034
ISSUED DATE:
3/23/2004
APPLIED DATE:
2/21/2004
EXPIRED DATE:
9/22/2004
SITE APN:
C2519656
STATUS:
COMPLETED
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501
FRISCO TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
343802.88
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL FINAL 7/13/2004 C$30.00
LAWNSPRINKLERSYSTEM$35.00
MISCELLANEOUS PLUMBING FEES$260.00
RESIDENTIAL ELECTRIC FEE$169.11
MISCELLANOUS MECHANICAL FEES$136.00
BUILDING PERMIT FEE$2,213.75
FENCE FEE$20.00
1 INCH METER$365.00
PLUMBING FINAL 7/22/2004 TG$30.00
CO 8/5/2004 TW$30.00
Total Fees:$3,288.86
______  PLUMBING ROUGH-IN
______  SLAB
______  WATER METER
______  SLAB
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS
______  DRY WALL
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  ELECTRICAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  SLAB
______  UTILITY / ROW
______  CO
______  CAMERA
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)