|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/27/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-0357
|
JOB ADDRESS: 5566 GREENSBORO DR FRISCO, TX 75035 |
DESC:
2204 AC, 2850 SQ FT, SFR / 1 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 3/5/2004
APPLIED DATE:2/19/2004
EXPIRED DATE:9/4/2004
SITE APN:C2529487
STATUS:EXPIRED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 164440.44
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
5/8 INCH METER | $315.00 |
PLUMBING TOP OUT 5/3/2004 GU | $30.00 |
PLUMBING TOP OUT 5/12/2004 G | $30.00 |
WATER METER 3/8/2004 JR | $25.00 |
INSULATION 5/19/2004 KSH | $30.00 |
PLUMBING FINAL 7/13/2004 KSH | $30.00 |
PLUMBING FINAL 7/27/2004 KSH | $30.00 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $195.00 |
RESIDENTIAL ELECTRIC FEE | $85.50 |
BUILDING PERMIT FEE | $1,318.75 |
FLATWORK 5/17/2004 MC | $30.00 |
ELECTRICAL FINAL 7/2/2004 TG | $30.00 |
ELECTRICAL FINAL 7/8/2004 TG | $30.00 |
ELECTRICAL FINAL 7/27/2004 T | $30.00 |
PLUMBING FINAL 7/2/2004 TW | $30.00 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $2,440.75 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ WATER METER |
______ T-POLE |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ FLATWORK |
______ FLATWORK |
______ INSULATION |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO |
______ CO/BUILDING FINAL |
______ METER PAYMENT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|