|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/14/2004
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B04-0352
|
JOB ADDRESS: 6136 FRISCO SQUARE BLVD #275 FRISCO, TX |
DESC:
2092 SQ FT, CIFO / DR. MC ELHANEY, DDS |
|
OWNER:
FRISCO SQUARE LTD
8940 JOHN ELLIOTT DR FRISCO TX 75034
|
CONTRACTOR:
FRISCO SQUARE LTD
8940 JOHN ELLIOTT DR FRISCO TX 75034
|
ISSUED DATE: 3/1/2004
APPLIED DATE:2/9/2004
EXPIRED DATE:8/31/2004
SITE APN:C2567552
STATUS:COMPLETED
|
|
APPLICANT:
JM DESIGN ASSOC, INC
2612 LONG PRAIRIE #A FLOWER MOUND TX 75022
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 177820
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
MISCELLANEOUS PLUMBING FEES | $140.00 |
COMMERCIAL BUILDING PERMIT FEE | $830.25 |
COMMERCIAL ELECTRIC FEE | $83.68 |
MISCELLANOUS MECHANICAL FEES | $72.00 |
PLUMBING TOP OUT 4/19/2004 T | $35.00 |
PLUMBING TOP OUT 6/10/2004 T | $35.00 |
PLUMBING ROUGH-IN 3/24/2004 | $35.00 |
Total Fees: | $1,230.93 |
|
|
| ______ PLUMBING ROUGH-IN |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ FRAME |
______ INSULATION |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ DRY WALL |
______ CEILING |
______ CEILING |
______ PLUMBING TOP OUT |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ CO |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|