|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/10/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-0273
|
JOB ADDRESS: 4679 HAVERFORD DR FRISCO, TX 75034 |
DESC:
4596 AC, 5414 SQ FT, SFR \ 2 STORY |
|
OWNER:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
CONTRACTOR:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
ISSUED DATE: 2/17/2004
APPLIED DATE:2/3/2004
EXPIRED DATE:8/16/2004
SITE APN:D247919
STATUS:COMPLETED
|
|
APPLICANT:
SOTHERBY HOMES
2400 DALLAS PARKWAY #580 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 342907.56
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
INSULATION 6/3/2004 CW | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
CREDIT CARD CONVENIENCE FEE | $1.20 |
CO 9/9/2004 JM | $30.00 |
1 INCH METER | $365.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,208.75 |
RESIDENTIAL ELECTRIC FEE | $162.42 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
LATH 5/24/2004 RM | $30.00 |
2NDS 5/24/2004 RM | $30.00 |
PLUMBING TOP OUT 5/7/2004 TR | $30.00 |
Total Fees: | $3,378.87 |
|
|
| ______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ FRAME |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ LATH |
______ 2NDS |
______ LATH |
______ 2NDS |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ CO |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CAMERA |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|