Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/24/2004 PERMIT SUB-TYPE: CNEW PERMIT NO: B04-0176
JOB ADDRESS:
11408 YOAKUM DR
, TX 75035
DESC:   440 SQ FT, CNEW/ PANTHER CREEK AMENITY CENTER RESTROOMS
OWNER:
Panther Creek Ventures, Ltd.
1401 Burnham Drive
Plano TX 75093

CONTRACTOR:
JFG CONCRETE
PO BOX 495114
GARLAND TX
ISSUED DATE:
2/24/2004
APPLIED DATE:
2/9/2004
EXPIRED DATE:
8/23/2004
SITE APN:
C2532811
STATUS:
COMPLETED
APPLICANT:
JFG CONCRETE
PO BOX 495114
GARLAND TX
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
75000
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING TOP OUT 4/6/2004 CK$35.00
CO 7/23/2004 CW$30.00
ELECTRICAL FINAL 5/27/2004 J$35.00
ELECTRICAL 3/17/2004 JB$35.00
PLUMBING FINAL 6/7/2004 KSH$30.00
2 INCH PD METER$565.00
FLATWORK 2/25/2004 MC$35.00
BUILDING FINAL 7/19/2004 MC$30.00
MISCELLANEOUS ELECTRICAL FEES$54.50
COMMERCIAL BUILDING PERMIT FEE$491.25
MISCELLANOUS MECHANICAL FEES$29.50
MISCELLANEOUS PLUMBING FEES$133.00
ELECTRICAL FINAL 4/23/2004 T$35.00
Total Fees:$1,538.25
______  FLATWORK
______  FLATWORK
______  PLUMBING ROUGH-IN
______  SLAB
______  ELECTRICAL
______  PLUMBING ROUGH-IN
______  DRY WALL
______  WATER METER
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  ELECTRICAL FINAL
______  ELECTRICAL
______  ELECTRICAL
______  ELECTRICAL
______  CO
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL RELEASE
______  ELECTRICAL RELEASE
______  PLUMBING FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  CO
______  BUILDING FINAL
______  CO
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)