Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/6/2004 PERMIT SUB-TYPE: CNEW PERMIT NO: B04-0094
JOB ADDRESS:
11300 RESEARCH RD
FRISCO,
DESC:   47654 AC, 67797 SQ FT, CNEW / FRISCO PUBLIC WORKS
OWNER:
FRISCO CITY OF

FRISCO TX 75034-3253

CONTRACTOR:
Thomas S. Byrne
2777 Stemmons Freeway, Suite 9
Dallas TX 75207
ISSUED DATE:
2/11/2004
APPLIED DATE:
1/15/2004
EXPIRED DATE:
8/10/2004
SITE APN:
C2115742
STATUS:
COMPLETED
APPLICANT:
THOS. S BYRNE
2777 STEMMONS FRWY
DALLAS TX 75207
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
8000000
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD CONVENIENCE FEE$1.20
MISCELLANEOUS PLUMBING FEES$0.00
ELECTRICAL RELEASE 9/22/2004$35.00
LAWNSPRINKLERSYSTEM$35.00
FIRE DEPT INSPECTION FEES$50.00
Total Fees:$121.20
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  WATER
______  WATER
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  GAS AIR TEST
______  PLUMBING ROUGH-IN
______  ELECTRICAL
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FRAME
______  FRAME
______  MECHANICAL
______  PLUMBING TOP OUT
______  ELECTRICAL
______  FRAME
______  MECHANICAL
______  PLUMBING TOP OUT
______  ELECTRICAL
______  INSULATION
______  INSULATION
______  ELECTRICAL
______  INSULATION
______  WATER METER
______  WATER METER
______  WATER METER
______  WATER METER
______  INSULATION
______  INSULATION
______  ELECTRICAL
______  ELECTRICAL
______  MECHANICAL
______  CEILING
______  ELECTRICAL
______  ELECTRICAL RELEASE
______  ELECTRICAL RELEASE
______  ELECTRICAL RELEASE
______  MECHANICAL
______  ELECTRICAL
______  GAS PRESSURE
______  ELECTRICAL
______  PLUMBING TOP OUT
______  FRAME
______  ELECTRICAL RELEASE
______  FRAME
______  PLUMBING ROUGH-IN
______  PLUMBING FINAL
______  ELECTRICAL
______  GAS RELEASE
______  CEILING
______  ELECTRICAL
______  WATER METER
______  ELECTRICAL
______  GAS AIR TEST
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING TOP OUT
______  ELECTRICAL FINAL
______  ELECTRICAL
______  GAS RELEASE
______  ELECTRICAL FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)