|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/13/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-3427
|
JOB ADDRESS: 3760 SUN GARDEN DR , TX 75034 |
DESC:
2402 AC, 2956 SQ FT, SFR / 1 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 1/5/2004
APPLIED DATE:12/7/2003
EXPIRED DATE:6/4/2004
SITE APN:D248382
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 179213.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
1 INCH METER | $365.00 |
2NDS 3/1/2004 GU | $30.00 |
PLUMBING ROUGH-IN 1/7/2004 K | $30.00 |
PLUMBING TOP OUT 2/18/2004 K | $30.00 |
RESIDENTIAL ELECTRIC FEE | $88.68 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
BUILDING PERMIT FEE | $1,393.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $202.00 |
PLUMBING FINAL 4/28/2004 TP | $30.00 |
PLUMBING FINAL 5/3/2004 TP | $30.00 |
Total Fees: | $2,350.93 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ FLATWORK |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|