|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/9/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-3372
|
JOB ADDRESS: 4609 ROCK CREEK LN FRISCO, TX 75034 |
DESC:
2486 AC, 3662 SQ FT, SFR / 2 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
CONTINENTAL HOMES
621 W. COLLEGE GRAPEVINE TX 76051
|
ISSUED DATE: 12/12/2003
APPLIED DATE:12/3/2003
EXPIRED DATE:6/11/2004
SITE APN:D232922
STATUS:COMPLETED
|
|
APPLICANT:
CONTINENTAL HOMES
621 W. COLLEGE GRAPEVINE TX 76051
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 185480.46
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS 1/28/2004 GDS | $30.00 |
PLUMBING FINAL 3/9/2004 GU | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
1 INCH METER | $365.00 |
CO 3/23/2004 RM | $30.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
BUILDING PERMIT FEE | $1,423.75 |
FENCE FEE | $20.00 |
RESIDENTIAL ELECTRIC FEE | $109.86 |
MISCELLANEOUS PLUMBING FEES | $225.00 |
Total Fees: | $2,398.11 |
|
|
| ______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBING TOP OUT |
______ 2NDS |
______ PLUMBING TOP OUT |
______ 2NDS |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ INSULATION |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO |
______ UTILITY / ROW |
______ CO |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|