Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/11/2003 PERMIT SUB-TYPE: SNEW PERMIT NO: B03-3135
JOB ADDRESS:
2510 BRENTWOOD DR
FRISCO, TX
DESC:   2671 AC, 3115 SQ FT, SFR / 2 STORY
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230

CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
ISSUED DATE:
11/17/2003
APPLIED DATE:
10/31/2003
EXPIRED DATE:
5/16/2004
SITE APN:
D255207
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
232410.15
FEE SUMMARY
INSPECTION SUMMARY
1 INCH METER$365.00
WATER METER 12/11/2003 JR$25.00
PLUMBING TOP OUT 2/2/2004 KS$30.00
FENCE FEE$20.00
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$1,658.75
RESIDENTIAL ELECTRIC FEE$93.45
SLAB 12/29/2003 MBW$30.00
FLATWORK 12/29/2003 MBW$30.00
PLUMBING ROUGH-IN 12/8/2003$30.00
2NDS 2/5/2004 RM$30.00
Total Fees:$2,701.20
______  T-POLE
______  PLUMBING ROUGH-IN
______  CO
______  PLUMBING ROUGH-IN
______  WATER METER
______  WATER METER
______  SLAB
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS
______  2NDS
______  2NDS
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  CO
______  UTILITY / ROW
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)