Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/30/2003 PERMIT SUB-TYPE: SNEW PERMIT NO: B03-3003
JOB ADDRESS:
14583 HOLLY LEAF DR
, TX 75035
DESC:   3045 AC, 3504 SQ FT, SFR / 2 STORY
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230

CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
ISSUED DATE:
11/5/2003
APPLIED DATE:
10/17/2003
EXPIRED DATE:
5/4/2004
SITE APN:
C2524804
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200
DALLAS TX 75230
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
227187.45
FEE SUMMARY
INSPECTION SUMMARY
BRICK 3/24/2004 CK$30.00
BRICK 1995/12/32 CK$30.00
1 INCH METER$365.00
PLUMBING FINAL 4/20/2004 GU$30.00
RESIDENTIAL ELECTRIC FEE$105.12
MISCELLANOUS MECHANICAL FEES$136.00
BUILDING PERMIT FEE$1,633.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$267.00
PLUMBING TOP OUT 3/3/2004 TR$30.00
SLAB 2/2/2004 TW$30.00
2NDS 3/9/2004 TW$30.00
2NDS 3/12/2004 TW$30.00
Total Fees:$2,736.87
______  T-POLE
______  PIER
______  PLUMBING ROUGH-IN
______  WATER METER
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS
______  2NDS
______  2NDS
______  INSULATION
______  DRY WALL
______  BRICK
______  BRICK
______  BRICK
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)