|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/25/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-2926
|
JOB ADDRESS: 14798 HOLLY LEAF DR FRISCO, TX 75035 |
DESC:
3037 AC, 3662 SQ FT, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 10/29/2003
APPLIED DATE:10/11/2003
EXPIRED DATE:4/28/2004
SITE APN:C2524781
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 226590.57
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
UTILILTY / ROW 2/25/2004 GAS | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
2NDS 12/3/2003 RM | $30.00 |
PLUMBING FINAL 1/21/2004 TRC | $30.00 |
CO 2/25/2004 TW | $30.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,628.75 |
RESIDENTIAL ELECTRIC FEE | $109.86 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
FENCE FEE | $20.00 |
1 INCH METER | $365.00 |
Total Fees: | $2,660.61 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ PRE POUR INSPECTION |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO |
______ SLAB |
______ CAMERA |
______ UTILITY / ROW |
______ CO |
______ UTILITY / ROW |
______ CO |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|