|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/24/2003
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B03-2770
|
JOB ADDRESS: 3205 MAIN ST FRISCO, TX 75034 |
DESC:
65493 SQ FT, CNEW / KROGER #547 |
|
OWNER:
KROGER TEXAS
16770 IMPERIAL VALLEY DR HOUSTON TX 77060
|
CONTRACTOR:
|
ISSUED DATE: 10/30/2003
APPLIED DATE:9/27/2003
EXPIRED DATE:4/28/2004
SITE APN:D271915
STATUS:COMPLETED
|
|
APPLICANT:
CDA ARCHITECTS
14403 CORNERSTONE VILLAGE DR HOUSTON TX 77014
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 2700000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
COMMERCIAL BUILDING PERMIT FEE | $6,580.14 |
FAST TRACK PLAN REVIEW | $550.00 |
MISCELLANEOUS ELECTRICAL FEES | $2,718.16 |
MISCELLANOUS MECHANICAL FEES | $434.55 |
MISCELLANEOUS PLUMBING FEES | $1,142.00 |
2 INCH PD METER | $565.00 |
SLAB 1995/12/32 JLS | $35.00 |
Total Fees: | $12,024.85 |
|
|
| ______ PIER |
______ PIER |
______ TILT WALL PANELS |
______ T-POLE |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ BRICK/WALL TIES |
______ FRAME |
______ ELECTRICAL |
______ INSULATION |
______ ELECTRICAL RELEASE |
______ SLAB |
______ SLAB |
______ DRY WALL |
______ PLUMBING ROUGH-IN |
______ MECHANICAL |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ SLAB |
______ FLATWORK |
______ ELECTRICAL |
______ SLAB |
______ GAS PRESSURE |
______ PAVING |
______ GAS RELEASE |
______ GAS PRESSURE |
______ FRAME |
______ MECHANICAL |
______ ELECTRICAL |
______ FRAME |
______ ELECTRICAL |
______ INSULATION |
______ MECHANICAL |
______ MECHANICAL |
______ WATER METER |
______ FRAME |
______ CEILING |
______ GAS RELEASE |
______ CEILING |
______ FRAME |
______ FLATWORK |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ CO |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|