Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/8/2003 PERMIT SUB-TYPE: CIFO PERMIT NO: B03-2769
JOB ADDRESS:
279 MAIN ST #114
FRISCO, TX 75034
DESC:   2242 SQ FT, CIFO / FRISCO FAMILY EYE CARE
OWNER:
DR STEVE MCDANIEL
279 MAIN ST, SUITE 114
FRISCO TX 75034

CONTRACTOR:
MED TECH CONSTRUCTION
P.O. BOX 472101
GARLAND TX 75047
ISSUED DATE:
10/9/2003
APPLIED DATE:
9/27/2003
EXPIRED DATE:
4/8/2004
SITE APN:
D254706
STATUS:
COMPLETED
APPLICANT:
MED TECH CONSTRUCTION
P.O. BOX 472101
GARLAND TX 75047
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
89620
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL ROUGH IN 10/17/200$35.00
CEILING 11/11/2003 JB$35.00
PLUMBING TOP OUT 10/22/2003$35.00
FAST TRACK PLAN REVIEW$150.00
COMMERCIAL BUILDING PERMIT FEE$554.25
MISCELLANEOUS PLUMBING FEES$138.00
MISCELLANOUS MECHANICAL FEES$100.80
MISCELLANEOUS ELECTRICAL FEES$109.68
Total Fees:$1,157.73
______  PLUMBING ROUGH-IN
______  PLUMBING TOP OUT
______  PLUMBING ROUGH-IN
______  PLUMBING TOP OUT
______  SLAB
______  FRAME
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  FRAME
______  2NDS
______  PLUMBING TOP OUT
______  2NDS
______  ELECTRICAL RELEASE
______  ELECTRICAL RELEASE
______  DUCT ROUGH
______  DRY WALL
______  ELECTRICAL
______  CEILING
______  CEILING
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)