|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/22/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-2610
|
JOB ADDRESS: 13458 MANNHEIM DR , TX 75034 |
DESC:
2753 AC, 3228 SQ FT, SFR / 2 STORY |
|
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
ISSUED DATE: 10/30/2003
APPLIED DATE:10/9/2003
EXPIRED DATE:4/28/2004
SITE APN:D248653
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 205401.33
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 1/19/2004 C | $30.00 |
1 INCH METER | $365.00 |
2NDS 12/15/2003 GU | $30.00 |
PLAN REVIEW FEE | $50.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING FINAL 1/29/2004 KSH | $30.00 |
RESIDENTIAL ELECTRIC FEE | $96.84 |
MISCELLANEOUS PLUMBING FEES | $225.00 |
FENCE FEE | $20.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
BUILDING PERMIT FEE | $1,523.75 |
PLUMBING ROUGH-IN 11/10/2003 | $30.00 |
PLUMBING TOP OUT 12/10/2003 | $30.00 |
Total Fees: | $2,588.59 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|