|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/11/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-2572
|
JOB ADDRESS: 15639 DURANGO DR FRISCO, TX 75035 |
DESC:
2168 AC, 3000 SQ FT, SFR / 1 STORY |
|
OWNER:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
CONTRACTOR:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
ISSUED DATE: 9/15/2003
APPLIED DATE:8/29/2003
EXPIRED DATE:3/15/2004
SITE APN:C2508167
STATUS:COMPLETED
|
|
APPLICANT:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 161754.48
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS 11/26/2003 CK | $30.00 |
BRICK 12/12/2003 CK | $30.00 |
BRICK 12/15/2003 CK | $30.00 |
PLUMBING FINAL 12/30/2003 GU | $30.00 |
PLUMBING FINAL 1/2/2004 GU | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING TOP OUT 11/3/2003 K | $30.00 |
PLUMBING TOP OUT 11/4/2003 K | $30.00 |
1 INCH METER | $365.00 |
ELECTRICAL FINAL 1/6/2004 MC | $30.00 |
PLUMBING FINAL 1/6/2004 PB | $30.00 |
PLUMBING ROUGH-IN 9/22/2003 | $30.00 |
PLUMBING ROUGH-IN 9/23/2003 | $30.00 |
PLUMBING ROUGH-IN 9/24/2003 | $30.00 |
SLAB 10/6/2003 TW | $30.00 |
PLUMBING TOP OUT 10/29/2003 | $30.00 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $202.00 |
BUILDING PERMIT FEE | $1,303.75 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
RESIDENTIAL ELECTRIC FEE | $90.00 |
Total Fees: | $2,525.75 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ SLAB |
______ T-POLE |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ BRICK |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ BRICK |
______ BRICK |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ CO |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|