|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/2/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-2511
|
JOB ADDRESS: 2772 BARNHILL LN FRISCO, TX |
DESC:
2701 AC, 3384 SQ FT, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 9/15/2003
APPLIED DATE:8/25/2003
EXPIRED DATE:3/15/2004
SITE APN:D255335
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 201521.61
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
T-POLE 9/24/2003 JM | $30.00 |
2NDS 11/3/2003 JM | $35.00 |
REPLACEMENT CARD FEE | $10.00 |
2NDS 10/31/2003 GDS | $30.00 |
2NDS 1995/12/32 GDS | $30.00 |
2NDS 1995/12/32 GDS | $30.00 |
DRY WALL 1995/12/32 GDS | $30.00 |
INSULATION 11/25/2003 GU | $30.00 |
SLAB 1995/12/32 JM | $30.00 |
PLUMBING TOP OUT 11/10/2003 | $30.00 |
PLUMBING TOP OUT 11/13/2003 | $30.00 |
PLUMBING TOP OUT 11/14/2003 | $30.00 |
PLUMBING TOP OUT 11/17/2003 | $30.00 |
PLUMBING TOP OUT 11/17/2003 | $30.00 |
1 INCH METER | $365.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
RESIDENTIAL ELECTRIC FEE | $101.52 |
BUILDING PERMIT FEE | $1,503.75 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
FENCE FEE | $20.00 |
PLUMBING FINAL 1/19/2004 TP | $30.00 |
PLUMBING FINAL 1/20/2004 TP | $30.00 |
PLUMBING FINAL 1/21/2004 TP | $30.00 |
CO 4/29/2004 TW | $30.00 |
Total Fees: | $2,897.27 |
|
|
| ______ PLUMBING ROUGH-IN |
______ T-POLE |
______ WATER METER |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO |
______ CO |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|