|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/9/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-2279
|
JOB ADDRESS: 5084 THACKERY DR FRISCO, TX 75034 |
DESC:
4127 AC, 5032 SQ FT, SFR / 2 STORY |
|
OWNER:
SOTHERBY HOMES
4975 PRESTON PARK BLVD. #360 PLANO TX 75093
|
CONTRACTOR:
SOTHERBY HOMES
4975 PRESTON PARK BLVD. #360 PLANO TX 75093
|
ISSUED DATE: 8/26/2003
APPLIED DATE:8/1/2003
EXPIRED DATE:2/28/2004
SITE APN:D247973
STATUS:COMPLETED
|
|
APPLICANT:
SOTHERBY HOMES
4975 PRESTON PARK BLVD. #360 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 307915.47
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FLATWORK 10/23/2003 CK | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
ELECTRICAL FINAL 2/25/2004 G | $30.00 |
2NDS 11/26/2003 JM | $30.00 |
1 INCH METER | $365.00 |
FENCE FEE | $20.00 |
RESIDENTIAL ELECTRIC FEE | $150.96 |
BUILDING PERMIT FEE | $2,033.75 |
MISCELLANEOUS PLUMBING FEES | $288.00 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING FINAL 3/4/2004 TP | $30.00 |
Total Fees: | $3,210.21 |
|
|
| ______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ CAMERA |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|