|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/5/2003
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B03-2234
|
JOB ADDRESS: 5575 WARREN PKWY #303 FRISCO, TX 75034 |
DESC:
1308 SQ FT, CIFO / QUEST DIAGNOSTIC |
|
OWNER:
QUEST DIAGNOSTIC
5575 WARREN PKWY FRISCO TX 75034
|
CONTRACTOR:
WESTEC CONSTRUCTION X- 2/04
801 ALPHA STE # 117 RICHARDSON TX 75081
|
ISSUED DATE: 8/5/2003
APPLIED DATE:7/28/2003
EXPIRED DATE:2/5/2004
SITE APN:R477600A00201
STATUS:COMPLETED
|
|
APPLICANT:
WESTEC CONSTRUCTION X- 2/04
801 ALPHA STE # 117 RICHARDSON TX 75081
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 88900
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH METER | $365.00 |
ELECTRICAL ROUGH IN 8/15/2003 | $35.00 |
ELECTRICAL ROUGH IN 8/19/2003 | $35.00 |
2ND TIME OUT FEE | $25.00 |
PLUMBING ROUGH-IN 8/20/2003 | $35.00 |
MISCELLANEOUS ELECTRICAL FEES | $52.32 |
MISCELLANOUS MECHANICAL FEES | $63.90 |
COMMERCIAL BUILDING PERMIT FEE | $550.05 |
FAST TRACK PLAN REVIEW | $200.00 |
MISCELLANEOUS PLUMBING FEES | $90.00 |
Total Fees: | $1,451.27 |
|
|
| ______ ELECTRICAL ROUGH IN |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ WATER METER |
______ PLUMBING TOP OUT |
______ FRAME |
______ PLUMBING TOP OUT |
______ ELECTRICAL |
______ MECHANICAL FINAL |
______ ELECTRICAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ BUILDING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|