Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 8/5/2003 PERMIT SUB-TYPE: CIFO PERMIT NO: B03-2234
JOB ADDRESS:
5575 WARREN PKWY #303
FRISCO, TX 75034
DESC:   1308 SQ FT, CIFO / QUEST DIAGNOSTIC
OWNER:
QUEST DIAGNOSTIC
5575 WARREN PKWY
FRISCO TX 75034

CONTRACTOR:
WESTEC CONSTRUCTION X- 2/04
801 ALPHA STE # 117
RICHARDSON TX 75081
ISSUED DATE:
8/5/2003
APPLIED DATE:
7/28/2003
EXPIRED DATE:
2/5/2004
SITE APN:
R477600A00201
STATUS:
COMPLETED
APPLICANT:
WESTEC CONSTRUCTION X- 2/04
801 ALPHA STE # 117
RICHARDSON TX 75081
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
88900
FEE SUMMARY
INSPECTION SUMMARY
1 INCH METER$365.00
2ND TIME OUT FEE$25.00
PLUMBING ROUGH-IN 8/20/2003$35.00
MISCELLANEOUS ELECTRICAL FEES$52.32
MISCELLANOUS MECHANICAL FEES$63.90
COMMERCIAL BUILDING PERMIT FEE$550.05
FAST TRACK PLAN REVIEW$200.00
MISCELLANEOUS PLUMBING FEES$90.00
ELECTRICAL ROUGH IN 8/19/2003$35.00
ELECTRICAL ROUGH IN 8/15/2003$35.00
Total Fees:$1,451.27
______  ELECTRICAL ROUGH IN
______  FRAME
______  ELECTRICAL ROUGH IN
______  MECHANICAL
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  WATER METER
______  PLUMBING TOP OUT
______  FRAME
______  PLUMBING TOP OUT
______  ELECTRICAL
______  MECHANICAL FINAL
______  ELECTRICAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  BUILDING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)