Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/19/2003 PERMIT SUB-TYPE: SNEW PERMIT NO: B03-2110
JOB ADDRESS:
4102 SUN KING LN
FRISCO, TX 75034
DESC:   1915 AC, 2462 SQ FT, SFR / 1 STORY
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006

CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006
ISSUED DATE:
7/30/2003
APPLIED DATE:
7/18/2003
EXPIRED DATE:
1/30/2004
SITE APN:
D248388
STATUS:
COMPLETED
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
142878.15
FEE SUMMARY
INSPECTION SUMMARY
INSULATION 10/21/2003 CW$30.00
1 INCH METER$365.00
BUILDING PERMIT FEE$1,208.75
MISCELLANOUS MECHANICAL FEES$96.50
RESIDENTIAL ELECTRIC FEE$73.86
FENCE FEE$20.00
ELECTRICAL FINAL 11/25/2003$30.00
LAWNSPRINKLERSYSTEM$35.00
PLUMBING TOP OUT 10/7/2003 T$30.00
MISCELLANEOUS PLUMBING FEES$202.00
Total Fees:$2,091.11
______  WATER METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  FLATWORK
______  T-POLE
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS
______  2NDS
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  CO
______  UTILITY / ROW
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)