BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/26/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-1811
|
JOB ADDRESS: 2812 NIGHTWIND CT FRISCO, TX |
DESC:
3242 AC, 4929 SQ FT, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 7/1/2003
APPLIED DATE:6/24/2003
EXPIRED DATE:
SITE APN:D255352
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 241885.62
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH METER | $365.00 |
2NDS 1995/12/32 GDS | $30.00 |
2NDS 9/11/2003 JM | $30.00 |
INSULATION 9/18/2003 JM | $30.00 |
PLUMBING TOP OUT 8/25/2003 K | $30.00 |
RESIDENTIAL ELECTRIC FEE | $147.87 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $267.00 |
BUILDING PERMIT FEE | $1,703.75 |
FENCE FEE | $20.00 |
PLUMBING TOP OUT 8/22/2003 T | $30.00 |
PLUMBING TOP OUT 8/26/2003 T | $30.00 |
PLUMBING FINAL 10/29/2003 TR | $30.00 |
PLUMBING FINAL 10/31/2003 TR | $30.00 |
PLUMBING FINAL 11/3/2003 TRC | $30.00 |
Total Fees: | $2,909.62 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ WATER METER |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ 2NDS |
______ 2NDS |
______ ELECTRICAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO |
______ CO |
______ WATER METER |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|