|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/28/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-1640
|
JOB ADDRESS: 4754 HERITAGE OAKS DR , TX 75034 |
DESC:
5118 AC, 5572 SQ FT, SFR / 2 STORY |
|
OWNER:
HUNTINGTON HOMES
12850 HILLCREST RD #200 DALLAS TX 75230
|
CONTRACTOR:
HUNTINGTON HOMES
12850 HILLCREST RD #200 DALLAS TX 75230
|
ISSUED DATE: 6/30/2003
APPLIED DATE:6/6/2003
EXPIRED DATE:
SITE APN:C2525840
STATUS:COMPLETED
|
|
APPLICANT:
HUNTINGTON HOMES
12850 HILLCREST RD #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 381853.98
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
1 INCH METER | $365.00 |
PLUMBING ROUGH-IN 7/8/2003 K | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLUMBING ROUGH-IN 7/3/2003 K | $30.00 |
BUILDING PERMIT FEE | $2,403.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $323.00 |
MISCELLANOUS MECHANICAL FEES | $175.50 |
RESIDENTIAL ELECTRIC FEE | $167.16 |
PLUMBING TOP OUT 9/3/2003 TR | $30.00 |
PLUMBING FINAL 10/27/2003 TR | $30.00 |
Total Fees: | $3,659.41 |
|
|
| ______ WATER METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO |
______ UTILITY / ROW |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|