|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/9/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-1582
|
JOB ADDRESS: 2181 FOX RIDGE TRL FRISCO, TX |
DESC:
3189 AC, 3677 SQ FT, SFR / 2 STORY |
|
OWNER:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
CONTRACTOR:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
ISSUED DATE: 6/13/2003
APPLIED DATE:5/29/2003
EXPIRED DATE:
SITE APN:D238628
STATUS:COMPLETED
|
|
APPLICANT:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 237931.29
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH METER | $365.00 |
T-POLE 6/20/2003 DW | $30.00 |
SLAB 7/21/2003 DW | $30.00 |
SLAB 7/24/2003 DW | $30.00 |
CO 1995/12/32 GDS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $110.31 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
FENCE FEE | $20.00 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
BUILDING PERMIT FEE | $1,683.75 |
2NDS 8/28/2003 JM | $30.00 |
ELECTRICAL FINAL 10/1/2003 J | $30.00 |
ELECTRICAL FINAL 10/21/2003 | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING TOP OUT 8/22/2003 T | $30.00 |
PLUMBING TOP OUT 8/26/2003 T | $30.00 |
PLUMBING FINAL 10/6/2003 TRC | $30.00 |
PLUMBING FINAL 10/9/2003 TRC | $30.00 |
Total Fees: | $2,933.06 |
|
|
| ______ T-POLE |
______ T-POLE |
______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ INSULATION |
______ BRICK/WALL TIES |
______ 2NDS |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ CO |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|