Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/18/2003 PERMIT SUB-TYPE: SNEW PERMIT NO: B03-1410
JOB ADDRESS:
2414 THORNTREE DR
FRISCO, TX 75034
DESC:   3490 AC, 4115 SQ FT, SFR / 2 STORY
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A
COPPELL TX 75019

CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A
COPPELL TX 75019
ISSUED DATE:
5/21/2003
APPLIED DATE:
4/30/2003
EXPIRED DATE:
11/17/2003
SITE APN:
D255550
STATUS:
COMPLETED
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A
COPPELL TX 75019
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
260388.9
FEE SUMMARY
INSPECTION SUMMARY
LAWNSPRINKLERSYSTEM$35.00
2NDS 12/12/2003 CW$30.00
BUILDING PERMIT FEE$1,798.70
FENCE FEE$20.00
MISCELLANEOUS BUILDING PERMIT$0.15
MISCELLANOUS MECHANICAL FEES$129.50
MISCELLANEOUS PLUMBING FEES$225.00
RESIDENTIAL ELECTRIC FEE$123.45
1 INCH METER$365.00
ELECTRICAL FINAL 1/21/2004 J$30.00
CO 2/2/2004 JM$30.00
PLUMBING FINAL 1/27/2004 KSH$30.00
PLUMBING FINAL 1/28/2004 KSH$30.00
Total Fees:$2,846.80
______  WATER METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  FLATWORK
______  T-POLE
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS
______  2NDS
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO
______  CO
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)