Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/2/2003 PERMIT SUB-TYPE: CIFO PERMIT NO: B03-1031
JOB ADDRESS:
5601 WARREN PKWY
FRISCO, TX
DESC:   8766 SQ FT, CIFO / 2ND FLOOR PATIENT ROOM EXPANSION
OWNER:
FRISCO MEDICAL CENTER
5601 WARREN PKWY
FRISCO TX 75034

CONTRACTOR:


ISSUED DATE:
5/12/2003
APPLIED DATE:
4/11/2003
EXPIRED DATE:
11/8/2003
SITE APN:
C2632288
STATUS:
COMPLETED
APPLICANT:
ASCENSION GROUP ARCHITECTS
200 E ABRAM, SUITE 200
ARLINGTON TX 76010
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
775000
FEE SUMMARY
INSPECTION SUMMARY
SATURDAY WORK FEES$150.00
COMMERCIAL BUILDING PERMIT FEE$2,724.00
MISCELLANEOUS ELECTRICAL FEES$350.64
MISCELLANEOUS PLUMBING FEES$455.00
MISCELLANOUS MECHANICAL FEES$483.65
Total Fees:$4,163.29
______  ELECTRICAL ROUGH IN
______  FRAME
______  MECHANICAL
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  FRAME
______  PLUMBING TOP OUT
______  FRAME
______  PLUMBING TOP OUT
______  PLUMBING ROUGH-IN
______  PLUMBING TOP OUT
______  ELECTRICAL
______  DRY WALL
______  FRAME
______  ELECTRICAL ROUGH IN
______  DRY WALL
______  DRY WALL
______  MECHANICAL
______  ELECTRICAL ROUGH IN
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  MECHANICAL
______  CEILING
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)