Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/19/2003 PERMIT SUB-TYPE: SNEW PERMIT NO: B03-0729
JOB ADDRESS:
2288 FAWN MIST DR
FRISCO, TX
DESC:   4003 AC, 4723 SQ FT, SFR / 2 STORY
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206

CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206
ISSUED DATE:
4/23/2003
APPLIED DATE:
4/11/2003
EXPIRED DATE:
10/20/2003
SITE APN:
D250575
STATUS:
COMPLETED
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
298663.83
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING TOP OUT 5/29/2003 C$30.00
LAWNSPRINKLERSYSTEM$35.00
ELECTRICAL FINAL 8/20/2003 J$30.00
INSULATION 7/9/2003 MBW$30.00
2NDS 7/10/2003 MBW$30.00
T-POLE 6/19/2003 RM$30.00
BUILDING PERMIT FEE$1,988.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$260.00
MISCELLANOUS MECHANICAL FEES$162.50
PLAN REVIEW FEE$50.00
RESIDENTIAL ELECTRIC FEE$12.09
Total Fees:$2,678.34
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  T-POLE
______  PLUMBING TOP OUT
______  T-POLE
______  PLUMBING TOP OUT
______  FLATWORK
______  2NDS
______  2NDS
______  T-POLE
______  T-POLE
______  2NDS
______  2NDS
______  INSULATION
______  2NDS
______  2NDS
______  2NDS
______  INSULATION
______  DRY WALL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)