|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/11/2003
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B03-0674
|
JOB ADDRESS: 8860 FM 423 FRISCO, TX 75034 |
DESC:
3468 SQ FT, CNEW / COMPASS BANK |
|
OWNER:
COMPASS BANK
15 SOUTH 20TH ST Birmingham AL 35233
|
CONTRACTOR:
JE DUNN CONSTR X-03/04
1412 MAIN ST., STE 1075 DALLAS TX 75202
|
ISSUED DATE: 4/15/2003
APPLIED DATE:3/19/2003
EXPIRED DATE:10/12/2003
SITE APN:D254708
STATUS:COMPLETED
|
|
APPLICANT:
JE DUNN CONSTR X-03/04
1412 MAIN ST., STE 1075 DALLAS TX 75202
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 490000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
1.5 INCH TURB METER | $645.00 |
1 INCH METER | $365.00 |
MISCELLANOUS MECHANICAL FEES | $175.80 |
COMMERCIAL BUILDING PERMIT FEE | $1,766.25 |
MISCELLANEOUS ELECTRICAL FEES | $200.40 |
MISCELLANEOUS PLUMBING FEES | $133.00 |
PLUMBING ROUGH-IN 7/31/2003 | $35.00 |
Total Fees: | $3,355.45 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ INSULATION |
______ ELECTRICAL |
______ ELECTRICAL |
______ FRAME |
______ PLUMBING TOP OUT |
______ DRY WALL |
______ ELECTRICAL RELEASE |
______ ELECTRICAL |
______ MECHANICAL |
______ FRAME |
______ CEILING |
______ ELECTRICAL |
______ PAVING |
______ WATER METER |
______ WATER METER |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ BUILDING FINAL |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|