Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/26/2003 PERMIT SUB-TYPE: DPLX PERMIT NO: B03-0605
JOB ADDRESS:
11596 LENOX LN
FRISCO, TX
DESC:   1907 AC, 2382 SQ FT, DPLX / 2 STORY
OWNER:
MOORELAND CONSTRUCTION, INC. X
8992 PRESTON, STE. 110, BOX 11
FRISCO TX 75035

CONTRACTOR:
MOORELAND CONSTRUCTION, INC. X
8992 PRESTON, STE. 110, BOX 11
FRISCO TX 75035
ISSUED DATE:
4/1/2003
APPLIED DATE:
3/21/2003
EXPIRED DATE:
9/28/2003
SITE APN:
D235001
STATUS:
COMPLETED
APPLICANT:
MOORELAND CONSTRUCTION, INC. X
8992 PRESTON, STE. 110, BOX 11
FRISCO TX 75035
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
142281.27
FEE SUMMARY
INSPECTION SUMMARY
FLATWORK 9/25/2003 CW$30.00
LAWNSPRINKLERSYSTEM$35.00
5/8 INCH METER$315.00
RESIDENTIAL ELECTRIC FEE$71.46
BUILDING PERMIT FEE$1,208.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$225.00
PLAN REVIEW FEE$50.00
MISCELLANOUS MECHANICAL FEES$129.50
ELECTRICAL FINAL 1/27/2004 T$30.00
Total Fees:$2,114.71
______  WATER METER
______  PLUMBING ROUGH-IN
______  SLAB
______  PRE POUR INSPECTION
______  CAMERA
______  FLATWORK
______  APPROACH
______  BRICK/WALL TIES
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS
______  2NDS
______  INSULATION
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)