BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/4/2003
|
PERMIT SUB-TYPE: DPLX
|
PERMIT NO: B03-0526
|
JOB ADDRESS: 11447 CHAUCER DR FRISCO, TX |
DESC:
2087 AC, 2491 SQ FT, DPLX / 2 STORY |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
ISSUED DATE: 4/9/2003
APPLIED DATE:3/27/2003
EXPIRED DATE:10/6/2003
SITE APN:C2145531
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 155711.07
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
FENCE FEE | $20.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
PLAN REVIEW FEE | $100.00 |
2NDS 1995/12/32 DW | $30.00 |
2NDS 1995/12/32 DW | $30.00 |
BUILDING PERMIT FEE | $1,273.75 |
ELECTRICAL FINAL 6/20/2003 G | $30.00 |
PLUMBING FINAL 6/26/2003 PB | $30.00 |
PLUMBING FINAL 6/27/2003 PB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $75.15 |
SLAB 4/22/2003 DW | $30.00 |
MISCELLANEOUS PLUMBING FEES | $225.00 |
CO 1995/12/32 GDS | $30.00 |
Total Fees: | $2,068.40 |
|
|
| ______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO |
______ UTILITY / ROW |
______ CO |
______ UTILITY / ROW |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|