|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/1/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-0481
|
JOB ADDRESS: 16100 CUSTER TRL FRISCO, TX 75035 |
DESC:
3162 AC, 5714 SQ FT, SFR / 1 STORY |
|
OWNER:
JACKSON ALAN TANCE & BARBARA D
FRISCO TX 75035-6670
|
CONTRACTOR:
MRCH, INC.
POB 797512 DALLAS TX 75379
|
ISSUED DATE: 4/2/2003
APPLIED DATE:3/24/2003
EXPIRED DATE:9/29/2003
SITE APN:C944731
STATUS:COMPLETED
|
|
APPLICANT:
MRCH, INC.
POB 797512 DALLAS TX 75379
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 235916.82
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
RESIDENTIAL ELECTRIC FEE | $171.42 |
PLAN REVIEW FEE | $50.00 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
MISCELLANEOUS PLUMBING FEES | $207.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,673.75 |
PLUMBING ROUGH-IN 7/22/2003 | $0.00 |
REPLACEMENT CARD FEE | $10.00 |
1 INCH METER | $365.00 |
Total Fees: | $2,694.67 |
|
|
| ______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ T-POLE |
______ T-POLE |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ CAMERA |
______ FRAME |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO |
______ CO |
______ WATER METER |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|