|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/19/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B03-0041
|
JOB ADDRESS: 4571 DUVAL DR FRISCO, TX |
DESC:
2094 AC, 3186 SQ FT, SFR / 2 STORY |
|
OWNER:
CONTINENTAL HOMES
621 W. COLLEGE GRAPEVINE TX 76051
|
CONTRACTOR:
CONTINENTAL HOMES
621 W. COLLEGE GRAPEVINE TX 76051
|
ISSUED DATE: 1/20/2003
APPLIED DATE:1/7/2003
EXPIRED DATE:7/19/2003
SITE APN:D232933
STATUS:COMPLETED
|
|
APPLICANT:
CONTINENTAL HOMES
621 W. COLLEGE GRAPEVINE TX 76051
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 156233.34
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $81.48 |
FRAME 3/21/2003 TC | $30.00 |
FENCE FEE | $20.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
SLAB 2/6/2003 MC | $30.00 |
BUILDING PERMIT FEE | $1,278.75 |
Total Fees: | $1,809.23 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ FRAME |
______ FRAME |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ GAS/ELECTRIC |
______ GAS/ELECTRIC |
______ GAS/ELECTRIC |
______ CO |
______ UTILITY / ROW |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|