|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/10/2002
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B02-3088
|
JOB ADDRESS: 4190 LEGACY DR FRISCO, TX |
DESC:
5300 SQ FT, CIFO / BANK OF AMERICA |
|
OWNER:
Bank of America
400 S. Zang suite 1100 Dallas TX
|
CONTRACTOR:
DPR CONSTRUCTION CO
2400 DALLAS PARKWAY SUITE 450 PLANO TX 75093
|
ISSUED DATE: 2/27/2003
APPLIED DATE:10/23/2002
EXPIRED DATE:8/26/2003
SITE APN:C2122594
STATUS:COMPLETED
|
|
APPLICANT:
DPR CONSTRUCTION CO
2400 DALLAS PARKWAY SUITE 450 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 397000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
COMMERCIAL ELECTRIC FEE | $212.00 |
COMMERCIAL BUILDING PERMIT FEE | $1,487.25 |
MISCELLANOUS MECHANICAL FEES | $97.50 |
MISCELLANEOUS PLUMBING FEES | $124.00 |
ELECTRICAL ROUGH IN 3/18/2003 | $35.00 |
PLUMBING TOP OUT 3/27/2003 P | $35.00 |
Total Fees: | $1,990.75 |
|
|
| ______ PLUMBING |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ DRY WALL |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ T-POLE |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL RELEASE |
______ MECHANICAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ BUILDING FINAL |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|