Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/10/2002 PERMIT SUB-TYPE: CIFO PERMIT NO: B02-3088
JOB ADDRESS:
4190 LEGACY DR
FRISCO, TX
DESC:   5300 SQ FT, CIFO / BANK OF AMERICA
OWNER:
Bank of America
400 S. Zang suite 1100
Dallas TX

CONTRACTOR:
DPR CONSTRUCTION CO
2400 DALLAS PARKWAY SUITE 450
PLANO TX 75093
ISSUED DATE:
2/27/2003
APPLIED DATE:
10/23/2002
EXPIRED DATE:
8/26/2003
SITE APN:
C2122594
STATUS:
COMPLETED
APPLICANT:
DPR CONSTRUCTION CO
2400 DALLAS PARKWAY SUITE 450
PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
397000
FEE SUMMARY
INSPECTION SUMMARY
COMMERCIAL ELECTRIC FEE$212.00
COMMERCIAL BUILDING PERMIT FEE$1,487.25
MISCELLANOUS MECHANICAL FEES$97.50
MISCELLANEOUS PLUMBING FEES$124.00
ELECTRICAL ROUGH IN 3/18/2003$35.00
PLUMBING TOP OUT 3/27/2003 P$35.00
Total Fees:$1,990.75
______  PLUMBING
______  PLUMBING ROUGH-IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  DRY WALL
______  MECHANICAL
______  PLUMBING TOP OUT
______  PLUMBING ROUGH-IN
______  T-POLE
______  T-POLE
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL RELEASE
______  MECHANICAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  BUILDING FINAL
______  CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)