|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/2/2003
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B02-2545
|
JOB ADDRESS: 15716 BULL RUN DR , TX 75035 |
DESC:
2168 AC, 2599 SQ FT, SFR / 1 STORY ALSO SEE B03-0145 |
|
OWNER:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
CONTRACTOR:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
ISSUED DATE: 1/27/2003
APPLIED DATE:1/20/2003
EXPIRED DATE:7/26/2003
SITE APN:C2508374
STATUS:COMPLETED
|
|
APPLICANT:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 161754.48
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BUILDING PERMIT FEE | $1,238.75 |
FLATWORK 3/4/2003 CW | $30.00 |
MISCELLANEOUS ELECTRICAL FEES | $5.52 |
MISCELLANOUS MECHANICAL FEES | $83.50 |
PLAN REVIEW FEE | $50.00 |
FENCE FEE | $20.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $72.45 |
LAWNSPRINKLERSYSTEM | $35.00 |
2NDS 2/17/2003 CW | $30.00 |
MISCELLANEOUS BUILDING PERMIT | $65.00 |
MISCELLANEOUS PLUMBING FEES | $21.00 |
MISCELLANEOUS PLUMBING FEES | $181.00 |
Total Fees: | $1,882.22 |
|
|
| ______ PLUMBING ROUGH-IN |
______ T-POLE |
______ FOOTINGS |
______ PRE POUR INSPECTION |
______ PLUMBING TOP OUT |
______ 2NDS |
______ 2NDS |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ GAS/ELECTRIC |
______ CO |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|