|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/6/2002
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B02-2288
|
JOB ADDRESS: 2601 AVENUE OF THE STARS FRISCO, TX 75034 |
DESC:
HOCKEY CENTER |
|
OWNER:
CITY OF FRISCO
PO BOX 1100 FRISCO TX 75034-0019
|
CONTRACTOR:
|
ISSUED DATE: 8/8/2002
APPLIED DATE:8/6/2002
EXPIRED DATE:2/4/2003
SITE APN:C2656766
STATUS:COMPLETED
|
|
APPLICANT:
CENTEX CONSTRUCTION
2495 PARKWOOD BLVD FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 17189100
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
COMMERCIAL BUILDING PERMIT FEE | $33,964.35 |
FRAME 4/30/2003 JB | $35.00 |
Total Fees: | $33,999.35 |
|
|
| ______ ROOF DRAINS |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ CEILING |
______ MECHANICAL |
______ MECHANICAL |
______ COMM PLUMB TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ FRAME |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ROOF DRAINS |
______ ROOF DRAINS |
______ FRAME |
______ PLUMBING TOP OUT |
______ ROOF DRAINS |
______ PLUMBING TOP OUT |
______ ROOF DRAINS |
______ PLUMBING TOP OUT |
______ FRAME |
______ ROOF DRAINS |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ MECHANICAL |
______ ROOF DRAINS |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ ROOF DRAINS |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ FRAME |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ FRAME |
______ ELECTRICAL RELEASE |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ FRAME |
______ PLUMBING TOP OUT |
______ CEILING |
______ MECHANICAL |
______ T-POLE |
______ FRAME |
______ PLUMBING TOP OUT |
______ FRAME |
______ FRAME |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL RELEASE |
______ FRAME |
______ CEILING |
______ CEILING |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ CEILING |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ FRAME |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ FRAME |
______ FRAME |
______ MECHANICAL |
______ MECHANICAL |
______ FRAME |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ FRAME |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ FRAME |
______ FRAME |
______ CEILING |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ UNKNOWN |
______ FRAME |
______ CEILING |
______ PLUMBING TOP OUT |
______ CEILING |
______ MECHANICAL |
______ FRAME |
______ FRAME |
______ CEILING |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ CEILING |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ HEALTH FINAL |
______ LANDSCAPE |
______ LANDSCAPE |
______ BUILDING FINAL |
______ LANDSCAPE |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|